SiteTab Site Notes · Template

Template · 17 November 2026

Material Delivery Records: How to Track Deliveries on a Construction Site

Short and late deliveries are where money quietly leaks out of a construction site. A simple delivery record stops most of it. Free log included.

Materials are where money quietly leaks out of a construction site. A truck arrives with 6 m³ of concrete instead of 8. Cement comes 40 bags short and "the rest is coming tomorrow". Nobody writes it down, and a month later the invoice is for the full order.

A delivery record fixes most of this. Here is what to record for every delivery, with a free one-page delivery log.

Download the delivery log (PDF) One page, 18 rows. Keep it at the gate or fill it in digitally.

What to record for every delivery

1. Date and time

When it arrived, not when it was ordered. Late deliveries explain delays, and delays need dates.

2. Supplier and delivery note number

The chalan, waybill or delivery note number ties your record to their paperwork. Without it, the two never match.

3. Material and specification

"Cement" is not enough. "Cement M500", "Concrete B25", "Rebar 12 mm, 6 m lengths". Wrong specs arrive more often than people think.

4. Quantity ordered and quantity received

Write both. The gap between them is the line that matters when the invoice comes.

5. Condition

Damaged, wet, wrong size, short. Note it before the driver leaves, and on the delivery note too if you can.

6. Received by

A name, and a signature where possible. "Someone took it" is how deliveries go missing.

7. Photo

One photo of the load and one of the signed delivery note. The photo is often the only proof of what actually came off the truck.

Short, late and rejected deliveries

Why delivery records get lost in WhatsApp

On most sites, deliveries are reported the quickest way: "Sand arrived, 2 trucks" and a photo of the chalan in the site WhatsApp group. It is the right instinct, and then it scrolls away. By the time the invoice arrives, nobody can find which delivery was short or who received it.

The honest footnote: the log fills itself

SiteTab is a WhatsApp contact you add to your construction site group. When someone posts a delivery, a shortage or a chalan photo, it files it under materials with the quantity, the supplier, the date and a link to the original message, and keeps short and delayed deliveries open until they are sorted. Prices stay out of it: quantities only. One group is $10 a month, with a 7-day free trial and nothing to install.

Start your 7-day free trial No card needed.