Guide · 18 October 2026
On most small construction sites the real record already lives in a WhatsApp group. The problem is not the reporting. It is that nobody can find anything in it a week later. Here is a format that fixes that.
Keep it to what a client, partner or your future self will ask for. Seven items are enough:
Pin this in the group and ask the site supervisor to send it once, at the end of the day. It takes about two minutes.
DAILY REPORT, [date] Weather: [clear / rain / hot] Crew: [own crew number], [subcontractor and number] Done today: [work, location] Materials: [arrived / short / needed] Problems: [what is wrong, where] Instructions received: [from whom, what] Tomorrow: [plan] (photos follow)
SiteTab follows the same logic, laid out for reading rather than typing. This is a finished report, ready to share as a link or a PDF.

Each report has these parts, in this order. The outline below is made up, to show the shape.
DAILY REPORT No. 14 · Tue 14 Oct · Riverside Block B Status: On track Weather: Sunny, 31° / 22° AT A GLANCE Slab pour on level 2 finished. One new issue, one delivery. 12 updates · 1 new issue · 0 closed · 1 delivery OVERDUE Decision: tile sample, waiting on architect, 6 days WORK DONE (by area) Level 2: slab poured, curing started (photos) Basement stair: shuttering 70% complete (photos) ISSUES New: honeycombing on column C4 (High) Open: leak at north wall, day 2 MATERIALS Delivered: 40 bags cement Waiting: reinforcement steel, ordered 3 days ago DECISIONS Waiting: fire-door spec, with consultant, 2 days DOCUMENTS Revised drawing S-204 (Structural) COMING UP Strip level 1 formwork · Block work starts on level 2 CREW ON SITE Mason crew 14; steel fixers 6
Photos from the group sit next to the work they belong to. You review the draft, fix anything that is off, and then share it as a link or a PDF. Nothing goes out until you say so.
You can do this by hand: copy the day's messages into a document, sort them under the seven headings and attach the photos. On an active site that is an evening of work, and it is the first thing people stop doing.
This is what SiteTab does. You add the SiteTab WhatsApp contact to the site's group. It reads what your crew posts, files it as issues, progress, materials, approvals and documents, and drafts the daily report for you to review before you share it. The crew keeps using WhatsApp exactly as before.